01 / Voltage & frequency
Give both winding voltages, network frequency and the point of connection.
Prepare your brief →Compare oil-immersed, dry-type and power transformer options around voltage, load, installation and the documents your project requires.
Explore your options
| Equipment direction | When to assess it | What to clarify |
|---|---|---|
| Oil-immersed distribution | Distribution and project step-up/down applications where the site can accommodate the installation. | Voltage ratio, kVA, losses, cooling, liquid specification and containment. |
| Dry-type distribution | Projects considering a dry-type installation in a building or designated equipment area. | Ventilation, enclosure, ambient conditions, noise, losses and fire-design requirements. |
| Power transformers | Higher-capacity project interfaces requiring a detailed engineering and procurement specification. | MVA, insulation levels, impedance, tap arrangement, protection interfaces and acceptance tests. |
These are selection directions. Availability, ratings and compliance must be confirmed for the proposed model; this table is not a rated product catalogue.
Give both winding voltages, network frequency and the point of connection.
Prepare your brief →Include simultaneous loads, converter interfaces and any planned future expansion.
Read the selection guide →Specify indoor/outdoor conditions, access, ambient temperature, altitude and space constraints.
Discuss site conditions →| Specify | Why it belongs in the enquiry |
|---|---|
| kVA/MVA and voltage ratio | Establish the electrical duty before choosing a physical configuration. |
| Impedance, vector group and taps | Coordinate the transformer with the electrical design and operating voltage. |
| Losses, noise and cooling | Compare the proposed equipment on the same operating and acceptance basis. |
| Required documents and tests | Agree drawings, technical schedules, test reports and inspection scope before ordering. |
Browse available technical sheets and catalogue material. Request an English technical schedule for your proposed equipment.
Open transformer downloads →Follow the relationship between converter voltage, transformer selection and the grid interface.
Read the illustrated guide →Check what is included in each supply offer before comparing equipment prices.
Use the comparison checklist →Start with the project country, application and any requirements you already know. Detailed specifications can follow.
Discuss a transformer project