Size the operating duty before choosing the cabinet.
A BESS needs enough power to serve the intended load and enough usable energy to sustain that power. Discharge duration is usable energy divided by discharge power at the same measurement boundary. Nameplate energy, AC-delivered energy and guaranteed end-of-life energy are different quantities.
Work through a peak-shaving example.
Assume a site imports a constant 180 kW for 1.5 hours and targets a 120 kW import ceiling. Required battery discharge is 60 kW; delivered energy is 60 × 1.5 = 90 kWh. Assuming a 90% usable window and 95% one-way discharge efficiency, initial nominal energy is approximately 90 ÷ (0.90 × 0.95) = 105.3 kWh, before ageing and reserve allowances.
These are illustrative assumptions, not WAYTON product guarantees. Do not apply the same allowance twice if a supplier already quotes usable AC energy. Round-trip efficiency is not the same as discharge efficiency.
The same energy can serve different duties.
| Usable AC energy | Discharge power | Ideal duration |
|---|---|---|
| 200 kWh | 50 kW | 4 hours |
| 200 kWh | 100 kW | 2 hours |
| 200 kWh | 200 kW | 1 hour |
Each row requires equipment capable of the stated discharge power. A 200 kWh battery with a 100 kW output limit cannot serve the third row simply because its energy is sufficient. Actual duration also depends on auxiliaries and operating conditions.
Check the day around the discharge event.
Use interval demand and generation data to identify recharge windows, import/export limits and repeated peaks. A battery that completes one event but cannot recharge before the next event may fail the operating objective. Preserve any backup reserve separately from energy assigned to daily cycling.
Ask for ratings at a common boundary.
| Requirement | Evidence |
|---|---|
| Power | Continuous charge/discharge ratings at site conditions |
| Energy | Nominal and usable values; AC or DC boundary; beginning/end-of-life basis |
| Operating window | SOC limits, reserve and temperature restrictions |
| Lifetime | Throughput/cycle conditions and applicable warranty terms |
| Controls | Metering point, dispatch logic and connection constraints |
| Backup | Transfer behavior, grid-forming capability and protection design where required |
Treat backup as a separate system requirement.
Specify critical-load power, starting loads, acceptable interruption and required runtime. Outdoor storage does not automatically provide island operation or replace a UPS. For an example of coordinated backup equipment, read our U.S. data center case analysis.
Sources and next steps.
The NREL Timescales of Energy Storage reference explains power, usable energy and duration. Calculations above are WAYTON editorial examples. Compare storage options using your measured operating profile, and review our Italy cabinet selection guide for that market.